Site Improvements – Folwell School
This is not an SDA Project

RYEB Project:

Folwell School

455 Jacksonville Road

Mt. Holly, NJ 08060

Project Description:

The project consists of but are not limited to various site improvements at the Folwell School.

The Work shall include, but not be limited to, soil erosion control; selective demolition of asphalt paving, concrete curbing and sidewalks; installation of new paving, curbing and sidewalks; striping, signage, yard drains and piping, playfield backstops, and turf area restoration as indicated on the drawings.

Approx. Project Duration:

Construction shall begin on or about 09 July 2018 and shall be substantially completed on or before 24 August 2018.

Construction Budget:
Documents Information:

Proposal Forms, Instructions to Bidders, Specifications and other bid documents may be made available and examined by Prime Contract Bidders from the office of REGAN YOUNG ENGLAND BUTERA, PC; 456 High Street; Mt. Holly, New Jersey 08060 during regular business hours, (beginning on 19 March 2018).  Additional information, including a list of registered Bidders, can be obtained from the Architect’s web site (  Sub-Contractors and vendors may obtain copies from registered Prime Contract Bidders.  There is a $25.00 non-refundable cost to be a registered Bidder.  An electronic copy of the specifications and drawings shall be made available to registered Bidders; hard copies of the bidding documents shall not be available.  Access to the electronic documents shall be emailed to the Bidder upon receipt of their payment and all of the following information:

Business name

Contact person

Business mailing address

Business phone number

Business facsimile number

Email address


Angelo. P Butera, AIA, LEED AP


456 High Street

Mt. Holly, NJ 08060

(609) 265-2652/0333 Fax

Inquiry Deadline:

Prime Bidders must submit any substitution requests or questions concerning the project to the Architect on Form 006001 BIDDER REQUEST FOR INFORMATION included in the Project Manual no later than 1:00 PM Thursday, 12 April 2018.  The Architect will not respond to questions received by those other than Prime Bidders.

Contract Type:
Single Contract
Pre-Bid Meeting:
3:30 PM prevailing time, on Wednesday, 28 March 2018
Meeting Location:
Main Lobby of FOLWELL SCHOOL located at 455 Jacksonville Road; Mount Holly, New Jersey 08060
Bidder Requirement:

Prime bidders must be pre-qualified by the New Jersey Department of the Treasury, Department of Property and Management Construction, prior to the date that bids are received.  Any bids submitted under the terms of New Jersey Statutes not including a copy of a valid and active Pre-qualified/Classification Certificate and New Jersey Department of Labor Contractor Registration Certificate may be rejected as being non-responsive to bid requirements.

The following DPMC-Classified Trade(s) and License(s) are required by the Overall Prime Bidder and/or their subcontractors:

C008 General Construction or C009 General Construction/Alterations and Additions.

C054 Site Work.

Bids Due:
No later than 2:00 PM prevailing time, on Wednesday, 25 April 2018
Bid Location:

Board Offices located in the HOLBEIN SCHOOL

331 Levis Drive

Mount Holly, New Jersey 08060

(609) 267-7033, Ext 7100

The MOUNT HOLLY TOWNSHIP BOARD OF EDUCATION has the right to award the contracts within sixty (60) days of the bid opening and reserves the right to reject any or all bids and to waive any non-material defects, as may be permitted by law.


#5513Ca This is not an SDA Project
Site Improvements – Folwell School

Bidder Classification Telephone Email
GWP Enterprises, Inc. GC 856-694-4482
A-Tech Concrete Company GC 732-248-1777
Think Pavers Hardscaping, LLC GC 856-832-4680
Ranco Construction, Inc. GC 609-801-1808
iSqFt., Inc. RS 800-364-2059
Classification Key:
General Contractor: GC
Plumbing: P
Electrical: E
Structural Steel: SS
Vendor V
Heating, Ventilating, AC: HVAC
Reporting Service: RS
Specialty Trade: ST


#5513Ca This is not an SDA Project
Site Improvements – Folwell School